Electricians

The electricians have been in, and the board for the service panel is in place.

That white board is where the electrician will put the box with the circuit breakers in it. They have already begun to run the wires into the boxes.

BoxUm. OK. I’m glad that they understand all of that.

I hope they understand all of that.

I also found the box shown in the photo below.

BoxI think that is a box where one of the smoke detectors will be wired in.

Notice! No dirt. No spiders!

The plumber has been busy too. He has been building the manifolds for the PEX.

ManifoldsEach of the tubes coming out of the manifold goes to a faucet or fixture of some kind. The ones on the right are for cold water, so that manifold is plumbed directly into the cold water pipe above. The ones on the left are for hot water, so they will eventually be plumbed into the hot water tank, sitting on the left side of the photo.

Each of the PEX tubes has its own valve, so any fixture in the house can be shut off at the panel. Pretty neat.

Meanwhile, the garage doors have been installed.

Garage DoorsAnd the door knobs on the man doors….. er…… “person” doors… have been installed.

KnobsWe can lock the house up.

This entry was posted in House Project. Bookmark the permalink.

Comments are closed.